Noticias Noticias SHANTUI
Two units Shantui SjHZS180-3R concrete mixing plates were used for the construction of the Wufengshan Yangtze River Bridge
Volumen de lectura:11
01 February, 2021

The CR train drove at high speed through the Wufengshan Yangtze River Bridge that is 64m high above the river water, symbolizing the official completion and operation of the world’s first high-speed railway suspension bridge.

In the earlier stage, two units Shantui SjHZS180-3R concrete mixing plates were used for the construction of this project. 


Suscripción a Noticias
Bienvenido a solicitar noticias oficiales